2.4m Surf kayak - my first design and build project 
MDF forms and solid end blocks screwed to strongback. Strips glued and stapled in place.
MDF forms and solid end blocks screwed to strongback. Strips glued and stapled in place.
Viewed: 94 times.

Hull
Hull
Viewed: 638 times.

Deck strips complete, coaming glued and clamped
Deck strips complete, coaming glued and clamped
Viewed: 675 times.

End blocks carved out
End blocks carved out
Viewed: 83 times.

2 halves
2 halves
Viewed: 93 times.

gluing deck and hull
gluing deck and hull
Viewed: 94 times.

seat structure
seat structure
Viewed: 78 times.

kayak finished
kayak finished
Viewed: 94 times.

surfing at last
surfing at last
Viewed: 86 times.

Powered by Gallery v1 RSS